USPS Industry P&DC Controls & VAV Replacement

2020-03-31T20:04:55+00:00

Athena Engineering was awarded this project as part of a lump sum base bid direct to the United States Postal Service. The City of Industry Processing and Distribution facility is one of the main processing hubs for the USPS in the San Gabriel Valley and Inland Empire. It processes 350,000 packages per day during [...]

Wilshire Ebell Theatre of Los Angeles

2020-02-25T20:04:09+00:00

In early 2019, Athena Engineering, Inc., DMG Corporation, and M. Weber & Associates, combined their extensive experience to work together on a transformative project for the historic Wilshire Ebell Theatre. As the design-builder on the team, we had the honor of guiding the project to completion on this amazing, historic jewel in the heart of [...]

SoCal Gas Pico Rivera Chiller Replacement

2020-04-09T19:20:23+00:00

The Southern California Gas Company's Pico Rivera base is the headquarters for the utility's facilities, training, and various operational departments. Athena Engineering, Inc. was the holder of a 3-year Master Services Agreement with Southern California Gas and managed the replacement of two chiller's at the Pico Rivera base. The design-build chiller replacements involved the [...]

Macy’s Stonestown Galleria Chiller Replacement

2018-02-16T00:43:54+00:00

Macy's, established in 1858, is the Great American Department Store - an iconic retailing brand with over 740 stores operating coast-to-coast and online. Macy's Stonestown Galleria offers a first class selection of top fashion brands amongst the thriving city of San Francisco, CA. Athena Engineering, Inc. was engaged by Macy's as the Prime Contractor [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration

2018-02-15T21:09:07+00:00

The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]

Kaiser Ontario Outpatient Medical Office Expansion

2020-04-09T19:10:04+00:00

Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. This project specifically involved design and [...]

Sally Ride Elementary School: A SMArT Academy

2018-02-16T01:03:35+00:00

This new school is 52,500 SF serving approximately 650 students on two levels and resides on a dense site of 2.7 acres. The academy, which serves kindergarten through fifth grades, includes 27 classrooms, administrative offices, a joint use multi-purpose space, food services and library. The sustainable campus reached 50 Collaborative for High Performance Schools [...]

Division 13 Metro Bus Maintenance & Operations Facility

2020-04-09T19:05:01+00:00

The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Kaiser Ontario Ambulatory Surgery Center OR Build-Out

2018-02-16T01:08:03+00:00

Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. The Ambulatory Surgery Center (ASC) building at [...]

Santiago Community College Science Building

2017-10-20T22:00:46+00:00

In 2002, voters approved Measure E, a $337 million general obligation bond to renovate existing campus buildings, construct new classrooms to alleviate overcrowding and expand the educational and training programs at Santiago Canyon College, Santa Ana College, the regional education centers and the District Operations Center of the Rancho Santiago Community College District (RSCCD). Santiago Community [...]

Kaiser Inglewood MOB HVAC Upgrade

2017-10-20T20:12:05+00:00

Kaiser Permanente directly contracted with Athena Engineering for the mechanical system replacement on this Kaiser Medical Office Building, located in the City of Inglewood. The facility serves as a medical office for an after hour clinic, family medicine, internal medicine, laboratory, pediatrics, pharmacy, physical therapy and radiology/ diagnostic imaging. Athena Engineering was awarded and provided [...]

Kaiser Ontario Medical Center OR/IR Shelled Space Build-Out

2017-09-07T00:07:09+00:00

Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. The $1.7 million scope included full [...]

Grifols Biological Bloodborne Pathogen Lab

2017-11-20T04:23:53+00:00

Grifols Biological (formerly Alpha Therapeutic) hired Athena Engineering, Inc. as a design-build HVAC contractor, directly with the owner, to provide the HVAC system for the Alpha 1 Production Area. The Alpha 1 Area houses the production of blood coagulant pharmaceuticals for the treatment of Hemophilia. The area presented a unique challenge as a single [...]

SCG HVAC & Building Automation Capital Project – 10 Bases

2017-09-06T20:39:01+00:00

This design-build HVAC and controls project required simultaneous performance on ten bases located throughout Southern California – Santa Barbara, Pacoima, Simi Valley, Hollywood, Pasadena, Chino, Canoga Park, Pico Rivera, Monterey Park and Woodland Hills. Athena Engineering, Inc. served as the design-build General Contractor and self-performed the Mechanical HVAC and controls on this contract. The scope [...]

Kaiser Vernon Dust Collection System

2017-09-06T00:15:34+00:00

This 27,000 square foot Kaiser facility required a dust collection system for a CNC Machinery shop. This facility manufacturers all the cabinetry for the Kaiser facilities in the western United States. Athena Engineering installed heavy gauge welded ductwork and distribution throughout the facility. In addition, specialized controls systems for redundant operation were installed and the system [...]

Los Angeles County Public Health Lab & Vivarium

2020-03-16T03:32:09+00:00

The Public Health Laboratory (PHL) is a biohazard laboratory that is commissioned to work on counter-terrorism research. The new 60,000 square foot location required a complete internal renovation to fit the required laboratories and office space.  The systems had to be redesigned and adapted to meet the CDC Biohazard Level 3 requirements immediately before the [...]

Los Angeles County Assessors Office HVAC Replacement

2017-09-06T00:25:10+00:00

The Lancaster Regional Office of the LA County Assessors Office handles all of the real estate and property appraisals for the light agricultural properties throughout Los Angeles County. Athena Engineering was hired on this design-build to remove and replace the existing unitary air conditioning system with new. The system was networked by Schneider Electric SE8000 [...]

Kaiser Indio Medical Office Building

2017-09-30T01:25:22+00:00

In order to meet increasing demand for healthcare services, Kaiser Permanente leased this former retail space in Indio, CA and directed the design-build team to change it to medical provider offices. The project team, led by C.W. Driver, transformed this former retail store into 14,367 SF of medical facilities, leaving 1,142 SF shelled space [...]

Piper Spirit Office Complex

2017-09-04T17:45:22+00:00

The Piper Spirit Office Complex project required Athena Engineering, Inc. to design and build two state of the art office buildings from the ground up. Both buildings are located on a 75,000 square foot lot (1.7 acres), and construction involved the coordination of several dozen trades. Athena Engineering served as the general contractor, mechanical HVAC, [...]

Marguerite Poindexter LaMotte Elementary School

2017-09-06T00:35:36+00:00

The two-story, steel-framed buildings is home to 650 students and occupies a 3.96-acre site. In addition to 26 classrooms, the 58,000-sq-ft school has administrative offices, play fields, a library, multi-purpose room, food service facility, lunch shelter and surface parking. This project is Certified LADWP Savings by Design & Certified High Performance Schools Verified. Athena [...]

Kaiser Fontana Medical Center Chemical Dependency Recovery Program HVAC

2018-05-10T01:39:37+00:00

This design-build project with Kaiser Permanente included the mechanical, electrical, plumbing, and structural engineering for the removal and replacement of the HVAC at a chemical dependency recovery program (CDRP) in Fontana, CA. The Kaiser CDRP provides inpatient and outpatient substance abuse treatment services, detoxification, partial hospitalization and counseling. Following the engineering portion of the project, [...]

Santee High School Proposition 39 HVAC & Controls Retrofit

2018-05-10T01:34:11+00:00

Athena Engineering, Inc. was selected by McKinstry Essention as the HVAC and building automation design-build partner for this retrofit project at the LAUSD Santee Education Complex. This project was funded by California's Proposition 39, a bond measure providing an estimated $2.75 billion over five years — to support energy efficiency and clean energy projects in K-12 schools and [...]

Amelia Mayberry Park Senior Center

2018-02-16T00:13:39+00:00

Amelia Mayberry Park is a 14-acre park located in the heart of Whittier, CA. This local treasure has basketball courts, softball fields, playgrounds, a Fitness Zone and a splash pad where children can cool off during the warm days of summer. A newly refurbished Senior Center located within the park is the site of great [...]

Larry D. Smith Correctional Facility Expansion

2017-09-06T00:30:51+00:00

Athena Engineering, Inc. completed an addition of a new 294-cell housing building (173,000 square feet) with adjacent support functions for transport holding, administrative offices and other workspaces. A separate central plant building containing mechanical equipment to serve the housing building was also included. Our team was responsible for creating information modeling using leading-edge software. [...]

Maryvale Education & Family Resource Center

2017-09-04T15:42:34+00:00

Athena Engineering, Inc. was responsible for the mechanical HVAC scope of work and building automation security, access and mechanical controls at this 35,600 square foot, ground-up Catholic educational facility located in Duarte, CA. The project included a multi-story new building with subterranean parking, a 40-classroom building, kitchen, playground and office space. Following completion of [...]

Augustus Hawkins High School

2017-09-04T15:44:37+00:00

This brand new 62,000 square foot high school for the Los Angeles Unified School District (formerly South Los Angeles High School #3) included a ground up, multi-story high school campus comprised of a gym, classrooms and administration buildings.  Athena Engineering, Inc. was responsible for the entire mechanical scope of work, including the HVAC and [...]

Go to Top