In 2002, voters approved Measure E, a $337 million general obligation bond to renovate existing campus buildings, construct new classrooms to alleviate overcrowding and expand the educational and training programs at Santiago Canyon College, Santa Ana College, the regional education centers and the District Operations Center of the Rancho Santiago Community College District (RSCCD). Santiago Community [...]
Grifols Biological Bloodborne Pathogen Lab
athenac7112017-11-20T04:23:53+00:00Grifols Biological (formerly Alpha Therapeutic) hired Athena Engineering, Inc. as a design-build HVAC contractor, directly with the owner, to provide the HVAC system for the Alpha 1 Production Area. The Alpha 1 Area houses the production of blood coagulant pharmaceuticals for the treatment of Hemophilia. The area presented a unique challenge as a single [...]

Los Angeles County Public Health Lab & Vivarium
athenac7112020-03-16T03:32:09+00:00The Public Health Laboratory (PHL) is a biohazard laboratory that is commissioned to work on counter-terrorism research. The new 60,000 square foot location required a complete internal renovation to fit the required laboratories and office space. The systems had to be redesigned and adapted to meet the CDC Biohazard Level 3 requirements immediately before the [...]

Los Angeles County Coroners Coroner-Medical Examiner Building
athenac7112017-09-04T22:29:02+00:00Athena Engineering, Inc. won this project on a design, bid, build basis with the Los Angeles County of Public Works. The system designed and installed, included: Fully operational coroners exam facility Retrofit of a double duct pneumatic system to a DDC system Provision of full pressurization control Schneider Electric / TAC Vista utilizing LonWorks protocol [...]