Athena Engineering was awarded this project as part of a lump sum base bid direct to the United States Postal Service. The City of Industry Processing and Distribution facility is one of the main processing hubs for the USPS in the San Gabriel Valley and Inland Empire. It processes 350,000 packages per day during [...]

Wilshire Ebell Theatre of Los Angeles
athenac7112020-02-25T20:04:09+00:00In early 2019, Athena Engineering, Inc., DMG Corporation, and M. Weber & Associates, combined their extensive experience to work together on a transformative project for the historic Wilshire Ebell Theatre. As the design-builder on the team, we had the honor of guiding the project to completion on this amazing, historic jewel in the heart of [...]

SoCal Gas Pico Rivera Chiller Replacement
athenac7112020-04-09T19:20:23+00:00The Southern California Gas Company's Pico Rivera base is the headquarters for the utility's facilities, training, and various operational departments. Athena Engineering, Inc. was the holder of a 3-year Master Services Agreement with Southern California Gas and managed the replacement of two chiller's at the Pico Rivera base. The design-build chiller replacements involved the [...]
Riverside Hall of Justice BAS/VFD Upgrade
athenac7112018-10-03T18:32:19+00:00Athena Engineering, Inc. won this project on a best value design-build Request for Proposal in conjunction with the Judicial Council of California and Jacobs Engineering. Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC building automation system. The system designed and provided, included: Schneider Electric StruxureWare utilizing LonWorks protocol network and [...]

Macy’s Stonestown Galleria Chiller Replacement
athenac7112018-02-16T00:43:54+00:00Macy's, established in 1858, is the Great American Department Store - an iconic retailing brand with over 740 stores operating coast-to-coast and online. Macy's Stonestown Galleria offers a first class selection of top fashion brands amongst the thriving city of San Francisco, CA. Athena Engineering, Inc. was engaged by Macy's as the Prime Contractor [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration
athenac7112018-02-15T21:09:07+00:00The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]
Montebello Library Chiller
athenac7112018-02-13T20:04:34+00:00Montebello was the first city in Los Angeles County to build a library with funds raised by a bond issue ($30,000). The building was erected in July 1930 at 115 So. Taylor Avenue. It served the community for 36 years before the library's current building was dedicated on October 20th, 1966. Athena Engineering, Inc. [...]

Kaiser Ontario Outpatient Medical Office Expansion
athenac7112020-04-09T19:10:04+00:00Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. This project specifically involved design and [...]

Kaiser Ontario Ambulatory Surgery Center OR Build-Out
athenac7112018-02-16T01:08:03+00:00Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. The Ambulatory Surgery Center (ASC) building at [...]

Marshall High School Prop 39 Controls Replacement
athenac7112020-04-09T19:03:18+00:00This project was a retrofit of existing HVAC equipment with new sensors, actuators, network cables, and a new DDC system as part of a bond-funded energy retrofit project for this historic LAUSD High School built in 1931. Athena Engineering, Inc. was contracted directly by McKinstry Essention, the LAUSD Energy Manager, and was the primary HVAC and [...]

El Sereno Middle School Athletic Field Upgrade & ADA Upgrades
athenac7112018-11-16T18:00:21+00:00Opening in 1937, El Sereno Middle School originally operated as a six-year high school, formally known as Woodrow Wilson High School. In 1969, this historic campus took over the name El Sereno Middle School. This public middle school, located in East Los Angeles CA, is home to 1,358 students, ranging from sixth to the eighth [...]

Clara Shortridge Criminal Courts Pneumatic Replacement
athenac7112017-10-20T20:00:42+00:00The Clara Shortridge Foltz Criminal Justice Center is the county courthouse in downtown Los Angeles, California. Originally known as the Criminal Courts Building, in 2002 it was renamed the Clara Shortridge Foltz Criminal Justice Center, after Clara S. Foltz, the first female lawyer on the west coast of the United States (and also the first person to propose the creation [...]

Kaiser Ontario Medical Center OR/IR Shelled Space Build-Out
athenac7112017-09-07T00:07:09+00:00Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. The $1.7 million scope included full [...]
Dodson Middle School Entry Pavers
athenac7112017-09-06T22:32:46+00:00As part of Athena Engineering, Inc.'s Job Order Contract with Los Angeles Unified School District, we were engaged to manage the installation of new entryway pavers for this keystone campus in Rancho Palos Verdes, CA. In the tight one-month compressed schedule during the summer vacation months, Athena Engineering and our team of subcontractors demolished and [...]
Grifols Biological Bloodborne Pathogen Lab
athenac7112017-11-20T04:23:53+00:00Grifols Biological (formerly Alpha Therapeutic) hired Athena Engineering, Inc. as a design-build HVAC contractor, directly with the owner, to provide the HVAC system for the Alpha 1 Production Area. The Alpha 1 Area houses the production of blood coagulant pharmaceuticals for the treatment of Hemophilia. The area presented a unique challenge as a single [...]

Griffith Observatory Rehabilitation & Remodel
athenac7112017-09-06T22:15:50+00:00Griffith Observatory is one of Los Angeles’ most visible and beloved landmarks, hosting over 70 million visitors since opening its doors in 1935. However, after decades of heavy use, the building was badly in need of repairs and upgrades – to both the physical building and the exhibits. The 2002 $93 million renovation project involved [...]

SCG HVAC & Building Automation Capital Project – 10 Bases
athenac7112017-09-06T20:39:01+00:00This design-build HVAC and controls project required simultaneous performance on ten bases located throughout Southern California – Santa Barbara, Pacoima, Simi Valley, Hollywood, Pasadena, Chino, Canoga Park, Pico Rivera, Monterey Park and Woodland Hills. Athena Engineering, Inc. served as the design-build General Contractor and self-performed the Mechanical HVAC and controls on this contract. The scope [...]
Kaiser Vernon Dust Collection System
athenac7112017-09-06T00:15:34+00:00This 27,000 square foot Kaiser facility required a dust collection system for a CNC Machinery shop. This facility manufacturers all the cabinetry for the Kaiser facilities in the western United States. Athena Engineering installed heavy gauge welded ductwork and distribution throughout the facility. In addition, specialized controls systems for redundant operation were installed and the system [...]
Blythe Courthouse BAS Integration
athenac7112017-09-04T23:14:25+00:00Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC controls system. The system designed and provided, included: Schneider Electric utilizing SmartStruxure including Lon protocol network and controllers Provided Ethernet IP routing and fiber optics backbone for maximum throughput Provided after hours installation and sequencing in an operational facility.

Los Angeles County Coroners Coroner-Medical Examiner Building
athenac7112017-09-04T22:29:02+00:00Athena Engineering, Inc. won this project on a design, bid, build basis with the Los Angeles County of Public Works. The system designed and installed, included: Fully operational coroners exam facility Retrofit of a double duct pneumatic system to a DDC system Provision of full pressurization control Schneider Electric / TAC Vista utilizing LonWorks protocol [...]

Los Angeles County Assessors Office HVAC Replacement
athenac7112017-09-06T00:25:10+00:00The Lancaster Regional Office of the LA County Assessors Office handles all of the real estate and property appraisals for the light agricultural properties throughout Los Angeles County. Athena Engineering was hired on this design-build to remove and replace the existing unitary air conditioning system with new. The system was networked by Schneider Electric SE8000 [...]

Kaiser Fontana Medical Center Chemical Dependency Recovery Program HVAC
athenac7112018-05-10T01:39:37+00:00This design-build project with Kaiser Permanente included the mechanical, electrical, plumbing, and structural engineering for the removal and replacement of the HVAC at a chemical dependency recovery program (CDRP) in Fontana, CA. The Kaiser CDRP provides inpatient and outpatient substance abuse treatment services, detoxification, partial hospitalization and counseling. Following the engineering portion of the project, [...]

Van Nuys Registrar-Recorder Building Automation Retrofit
athenac7112017-11-12T20:12:21+00:00The Los Angeles County Registrar-Recorder's Office is responsible for the registration of voters, maintenance of voter files, conduct of federal, state, local and special elections and the verification of initiative, referendum and recall petitions for the 4.8 million registered voters in Los Angeles County. The Recorder's Office is responsible for recording legal documents that determine [...]
Macy’s Las Vegas Home Store Parking Lot
athenac7112017-11-12T20:13:03+00:00The Macys Home Store is located in Las Vegas, Nevada is a busy department store sitting on over 203,500 square feet of property. Athena Engineering was contracted for multiple projects on site, including shoring of the overhang and replacement of the asphalt, concrete, and gutters on the entire property. Athena Engineering managed the scope of [...]

Los Angeles County Internal Services Headquarters AHU Coil Replacement
athenac7112017-11-20T04:17:36+00:00The Los Angeles Internal Services Department (ISD) provides a range of support services to all county departments in the areas of purchasing, contracting, facilities, information technology and other support services such as energy and environmental programs. ISD is the primary source of centralized services to maintain and support over 200 Los Angeles County facilities and [...]
Amelia Mayberry Park Senior Center
athenac7112018-02-16T00:13:39+00:00Amelia Mayberry Park is a 14-acre park located in the heart of Whittier, CA. This local treasure has basketball courts, softball fields, playgrounds, a Fitness Zone and a splash pad where children can cool off during the warm days of summer. A newly refurbished Senior Center located within the park is the site of great [...]
O’Melveny Elementary School ADA Upgrade
athenac7112017-10-20T19:44:34+00:00O’Melveny Elementary School, located in San Fernando CA, serves 565 students from kindergarten through fifth grade. Athena Engineering was directly contracted by the Los Angeles Unified School District to manage the removal and replacement of asphalt in several locations, providing all students with ADA compliant paths of travel. In each location we made modifications to [...]

Coldwater Canyon Elementary School ADA Upgrade
athenac7112017-10-20T19:37:26+00:00Athena Engineering had the opportunity to complete many projects as part of job order contract with the Los Angeles School District, including an ADA upgrade at Coldwater Canyon Elementary School. This beautiful campus is located in North Hollywood CA, and serves just south of 800 students ranging from the kindergarten level to the fifth grade. [...]