Wilshire Ebell Theatre of Los Angeles

2020-02-25T20:04:09+00:00

In early 2019, Athena Engineering, Inc., DMG Corporation, and M. Weber & Associates, combined their extensive experience to work together on a transformative project for the historic Wilshire Ebell Theatre. As the design-builder on the team, we had the honor of guiding the project to completion on this amazing, historic jewel in the heart of [...]

SoCal Gas Pico Rivera Chiller Replacement

2020-04-09T19:20:23+00:00

The Southern California Gas Company's Pico Rivera base is the headquarters for the utility's facilities, training, and various operational departments. Athena Engineering, Inc. was the holder of a 3-year Master Services Agreement with Southern California Gas and managed the replacement of two chiller's at the Pico Rivera base. The design-build chiller replacements involved the [...]

Riverside Hall of Justice BAS/VFD Upgrade

2018-10-03T18:32:19+00:00

Athena Engineering, Inc. won this project on a best value design-build Request for Proposal in conjunction with the Judicial Council of California and Jacobs Engineering. Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC building automation system. The system designed and provided, included: Schneider Electric StruxureWare utilizing LonWorks protocol network and [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration

2018-02-15T21:09:07+00:00

The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]

Division 13 Metro Bus Maintenance & Operations Facility

2020-04-09T19:05:01+00:00

The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Beverly Hospital

2018-10-03T18:30:06+00:00

Beverly Hospital is a general medical and surgical hospital in Montebello, CA, with 102 beds. In 2016, over 15,000 patients visited the hospital's emergency room. The hospital had a total of 7,180 admissions. Its physicians performed 1,204 inpatient and 2,952 outpatient surgeries. Athena Engineering, Inc. was engaged by the mechanical engineer, Ted Jacobs Engineering, [...]

Kaiser Inglewood MOB HVAC Upgrade

2017-10-20T20:12:05+00:00

Kaiser Permanente directly contracted with Athena Engineering for the mechanical system replacement on this Kaiser Medical Office Building, located in the City of Inglewood. The facility serves as a medical office for an after hour clinic, family medicine, internal medicine, laboratory, pediatrics, pharmacy, physical therapy and radiology/ diagnostic imaging. Athena Engineering was awarded and provided [...]

SCG HVAC & Building Automation Capital Project – 10 Bases

2017-09-06T20:39:01+00:00

This design-build HVAC and controls project required simultaneous performance on ten bases located throughout Southern California – Santa Barbara, Pacoima, Simi Valley, Hollywood, Pasadena, Chino, Canoga Park, Pico Rivera, Monterey Park and Woodland Hills. Athena Engineering, Inc. served as the design-build General Contractor and self-performed the Mechanical HVAC and controls on this contract. The scope [...]

Los Angeles County Public Health Lab & Vivarium

2020-03-16T03:32:09+00:00

The Public Health Laboratory (PHL) is a biohazard laboratory that is commissioned to work on counter-terrorism research. The new 60,000 square foot location required a complete internal renovation to fit the required laboratories and office space.  The systems had to be redesigned and adapted to meet the CDC Biohazard Level 3 requirements immediately before the [...]

Piper Spirit Office Complex

2017-09-04T17:45:22+00:00

The Piper Spirit Office Complex project required Athena Engineering, Inc. to design and build two state of the art office buildings from the ground up. Both buildings are located on a 75,000 square foot lot (1.7 acres), and construction involved the coordination of several dozen trades. Athena Engineering served as the general contractor, mechanical HVAC, [...]

Larry D. Smith Correctional Facility Expansion

2017-09-06T00:30:51+00:00

Athena Engineering, Inc. completed an addition of a new 294-cell housing building (173,000 square feet) with adjacent support functions for transport holding, administrative offices and other workspaces. A separate central plant building containing mechanical equipment to serve the housing building was also included. Our team was responsible for creating information modeling using leading-edge software. [...]

Maryvale Education & Family Resource Center

2017-09-04T15:42:34+00:00

Athena Engineering, Inc. was responsible for the mechanical HVAC scope of work and building automation security, access and mechanical controls at this 35,600 square foot, ground-up Catholic educational facility located in Duarte, CA. The project included a multi-story new building with subterranean parking, a 40-classroom building, kitchen, playground and office space. Following completion of [...]

Augustus Hawkins High School

2017-09-04T15:44:37+00:00

This brand new 62,000 square foot high school for the Los Angeles Unified School District (formerly South Los Angeles High School #3) included a ground up, multi-story high school campus comprised of a gym, classrooms and administration buildings.  Athena Engineering, Inc. was responsible for the entire mechanical scope of work, including the HVAC and [...]

Ramon C. Corines School of Visual and Performing Arts

2018-06-30T22:14:27+00:00

This project involved the new construction of a visual and performing arts high school in Los Angeles. The campus is within the Los Angeles Unified School District and consists of nine buildings and a central plant. Athena Engineering, Inc. was responsible for the installation of an Energy Management System consisting of Variable Air Volume [...]

LACCD Southwest College Central Plant

2017-09-04T15:45:30+00:00

This design-build building automation project consisted of the construction of a new central plant for the main cooling and heating media of the LACCD Southwest College campus. The project was a design/build that utilized thermal storage or ice tanks for cooling. The chilled water side of the project includes two air-cooled chillers that are primarily used [...]