This new school is 52,500 SF serving approximately 650 students on two levels and resides on a dense site of 2.7 acres. The academy, which serves kindergarten through fifth grades, includes 27 classrooms, administrative offices, a joint use multi-purpose space, food services and library. The sustainable campus reached 50 Collaborative for High Performance Schools [...]

Division 13 Metro Bus Maintenance & Operations Facility
athenac7112020-04-09T19:05:01+00:00The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Santiago Community College Science Building
athenac7112017-10-20T22:00:46+00:00In 2002, voters approved Measure E, a $337 million general obligation bond to renovate existing campus buildings, construct new classrooms to alleviate overcrowding and expand the educational and training programs at Santiago Canyon College, Santa Ana College, the regional education centers and the District Operations Center of the Rancho Santiago Community College District (RSCCD). Santiago Community [...]

El Sereno Middle School Athletic Field Upgrade & ADA Upgrades
athenac7112018-11-16T18:00:21+00:00Opening in 1937, El Sereno Middle School originally operated as a six-year high school, formally known as Woodrow Wilson High School. In 1969, this historic campus took over the name El Sereno Middle School. This public middle school, located in East Los Angeles CA, is home to 1,358 students, ranging from sixth to the eighth [...]
Dodson Middle School Entry Pavers
athenac7112017-09-06T22:32:46+00:00As part of Athena Engineering, Inc.'s Job Order Contract with Los Angeles Unified School District, we were engaged to manage the installation of new entryway pavers for this keystone campus in Rancho Palos Verdes, CA. In the tight one-month compressed schedule during the summer vacation months, Athena Engineering and our team of subcontractors demolished and [...]

Los Angeles County Coroners Coroner-Medical Examiner Building
athenac7112017-09-04T22:29:02+00:00Athena Engineering, Inc. won this project on a design, bid, build basis with the Los Angeles County of Public Works. The system designed and installed, included: Fully operational coroners exam facility Retrofit of a double duct pneumatic system to a DDC system Provision of full pressurization control Schneider Electric / TAC Vista utilizing LonWorks protocol [...]
Kaiser Indio Medical Office Building
athenac7112017-09-30T01:25:22+00:00In order to meet increasing demand for healthcare services, Kaiser Permanente leased this former retail space in Indio, CA and directed the design-build team to change it to medical provider offices. The project team, led by C.W. Driver, transformed this former retail store into 14,367 SF of medical facilities, leaving 1,142 SF shelled space [...]

Marguerite Poindexter LaMotte Elementary School
athenac7112017-09-06T00:35:36+00:00The two-story, steel-framed buildings is home to 650 students and occupies a 3.96-acre site. In addition to 26 classrooms, the 58,000-sq-ft school has administrative offices, play fields, a library, multi-purpose room, food service facility, lunch shelter and surface parking. This project is Certified LADWP Savings by Design & Certified High Performance Schools Verified. Athena [...]
O’Melveny Elementary School ADA Upgrade
athenac7112017-10-20T19:44:34+00:00O’Melveny Elementary School, located in San Fernando CA, serves 565 students from kindergarten through fifth grade. Athena Engineering was directly contracted by the Los Angeles Unified School District to manage the removal and replacement of asphalt in several locations, providing all students with ADA compliant paths of travel. In each location we made modifications to [...]

Coldwater Canyon Elementary School ADA Upgrade
athenac7112017-10-20T19:37:26+00:00Athena Engineering had the opportunity to complete many projects as part of job order contract with the Los Angeles School District, including an ADA upgrade at Coldwater Canyon Elementary School. This beautiful campus is located in North Hollywood CA, and serves just south of 800 students ranging from the kindergarten level to the fifth grade. [...]

Larry D. Smith Correctional Facility Expansion
athenac7112017-09-06T00:30:51+00:00Athena Engineering, Inc. completed an addition of a new 294-cell housing building (173,000 square feet) with adjacent support functions for transport holding, administrative offices and other workspaces. A separate central plant building containing mechanical equipment to serve the housing building was also included. Our team was responsible for creating information modeling using leading-edge software. [...]
Maryvale Education & Family Resource Center
athenac7112017-09-04T15:42:34+00:00Athena Engineering, Inc. was responsible for the mechanical HVAC scope of work and building automation security, access and mechanical controls at this 35,600 square foot, ground-up Catholic educational facility located in Duarte, CA. The project included a multi-story new building with subterranean parking, a 40-classroom building, kitchen, playground and office space. Following completion of [...]
El Rancho Charter Middle School
athenac7112017-09-04T15:43:59+00:00Athena Engineering, Inc. was selected by Bernards Builders for the Mechanical HVAC & Building Automation controls scope on this new Athletic and Science building on the existing El Rancho Charter Middle School campus. The building is a new 25,000 s.f. single story CMU building with structural steel members and wood stud framing. The main [...]
Augustus Hawkins High School
athenac7112017-09-04T15:44:37+00:00This brand new 62,000 square foot high school for the Los Angeles Unified School District (formerly South Los Angeles High School #3) included a ground up, multi-story high school campus comprised of a gym, classrooms and administration buildings. Athena Engineering, Inc. was responsible for the entire mechanical scope of work, including the HVAC and [...]