In early 2019, Athena Engineering, Inc., DMG Corporation, and M. Weber & Associates, combined their extensive experience to work together on a transformative project for the historic Wilshire Ebell Theatre. As the design-builder on the team, we had the honor of guiding the project to completion on this amazing, historic jewel in the heart of [...]

Kaiser Ontario Outpatient Medical Office Expansion
athenac7112020-04-09T19:10:04+00:00Kaiser Ontario Medical Center, located in Ontario, CA, is a 224-bed hospital that provides health services to the West end of San Bernardino County. This design-build project was one of three awarded to Athena Engineering, Inc. by Kaiser Permanente at Ontario Medical Center during the last half of 2016. This project specifically involved design and [...]

Sally Ride Elementary School: A SMArT Academy
athenac7112018-02-16T01:03:35+00:00This new school is 52,500 SF serving approximately 650 students on two levels and resides on a dense site of 2.7 acres. The academy, which serves kindergarten through fifth grades, includes 27 classrooms, administrative offices, a joint use multi-purpose space, food services and library. The sustainable campus reached 50 Collaborative for High Performance Schools [...]

Division 13 Metro Bus Maintenance & Operations Facility
athenac7112020-04-09T19:05:01+00:00The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Santiago Community College Science Building
athenac7112017-10-20T22:00:46+00:00In 2002, voters approved Measure E, a $337 million general obligation bond to renovate existing campus buildings, construct new classrooms to alleviate overcrowding and expand the educational and training programs at Santiago Canyon College, Santa Ana College, the regional education centers and the District Operations Center of the Rancho Santiago Community College District (RSCCD). Santiago Community [...]
Kaiser Indio Medical Office Building
athenac7112017-09-30T01:25:22+00:00In order to meet increasing demand for healthcare services, Kaiser Permanente leased this former retail space in Indio, CA and directed the design-build team to change it to medical provider offices. The project team, led by C.W. Driver, transformed this former retail store into 14,367 SF of medical facilities, leaving 1,142 SF shelled space [...]
Piper Spirit Office Complex
athenac7112017-09-04T17:45:22+00:00The Piper Spirit Office Complex project required Athena Engineering, Inc. to design and build two state of the art office buildings from the ground up. Both buildings are located on a 75,000 square foot lot (1.7 acres), and construction involved the coordination of several dozen trades. Athena Engineering served as the general contractor, mechanical HVAC, [...]

Marguerite Poindexter LaMotte Elementary School
athenac7112017-09-06T00:35:36+00:00The two-story, steel-framed buildings is home to 650 students and occupies a 3.96-acre site. In addition to 26 classrooms, the 58,000-sq-ft school has administrative offices, play fields, a library, multi-purpose room, food service facility, lunch shelter and surface parking. This project is Certified LADWP Savings by Design & Certified High Performance Schools Verified. Athena [...]

Larry D. Smith Correctional Facility Expansion
athenac7112017-09-06T00:30:51+00:00Athena Engineering, Inc. completed an addition of a new 294-cell housing building (173,000 square feet) with adjacent support functions for transport holding, administrative offices and other workspaces. A separate central plant building containing mechanical equipment to serve the housing building was also included. Our team was responsible for creating information modeling using leading-edge software. [...]
Maryvale Education & Family Resource Center
athenac7112017-09-04T15:42:34+00:00Athena Engineering, Inc. was responsible for the mechanical HVAC scope of work and building automation security, access and mechanical controls at this 35,600 square foot, ground-up Catholic educational facility located in Duarte, CA. The project included a multi-story new building with subterranean parking, a 40-classroom building, kitchen, playground and office space. Following completion of [...]
El Monte Busway & Transit Center
athenac7112017-09-04T15:42:59+00:00The El Monte Busway and Transit Center, owned and operated by Los Angeles Metro, is the largest bus facility west of Chicago and offers interstate, regional, and local bus services to an average of 40,000 passengers daily. The scope of this project doubled the size of the previous center with a two-level bus terminal. El Monte now [...]
El Rancho Charter Middle School
athenac7112017-09-04T15:43:59+00:00Athena Engineering, Inc. was selected by Bernards Builders for the Mechanical HVAC & Building Automation controls scope on this new Athletic and Science building on the existing El Rancho Charter Middle School campus. The building is a new 25,000 s.f. single story CMU building with structural steel members and wood stud framing. The main [...]
Augustus Hawkins High School
athenac7112017-09-04T15:44:37+00:00This brand new 62,000 square foot high school for the Los Angeles Unified School District (formerly South Los Angeles High School #3) included a ground up, multi-story high school campus comprised of a gym, classrooms and administration buildings. Athena Engineering, Inc. was responsible for the entire mechanical scope of work, including the HVAC and [...]