Riverside Hall of Justice BAS/VFD Upgrade

2018-10-03T18:32:19+00:00

Athena Engineering, Inc. won this project on a best value design-build Request for Proposal in conjunction with the Judicial Council of California and Jacobs Engineering. Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC building automation system. The system designed and provided, included: Schneider Electric StruxureWare utilizing LonWorks protocol network and [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration

2018-02-15T21:09:07+00:00

The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]

Division 13 Metro Bus Maintenance & Operations Facility

2020-04-09T19:05:01+00:00

The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Marshall High School Prop 39 Controls Replacement

2020-04-09T19:03:18+00:00

This project was a retrofit of existing HVAC equipment with new sensors, actuators, network cables, and a new DDC system as part of a bond-funded energy retrofit project for this historic LAUSD High School built in 1931. Athena Engineering, Inc. was contracted directly by McKinstry Essention, the LAUSD Energy Manager, and was the primary HVAC and [...]

Beverly Hospital

2018-10-03T18:30:06+00:00

Beverly Hospital is a general medical and surgical hospital in Montebello, CA, with 102 beds. In 2016, over 15,000 patients visited the hospital's emergency room. The hospital had a total of 7,180 admissions. Its physicians performed 1,204 inpatient and 2,952 outpatient surgeries. Athena Engineering, Inc. was engaged by the mechanical engineer, Ted Jacobs Engineering, [...]

Southwest Justice – Juvenile Courts Relocation

2017-09-28T23:30:00+00:00

In 2014, the County of Riverside Economic Development Agency approved the construction of a new 14,400 juvenile hall court building with associated facilities at the Southwest Justice Center in Riverside, CA, managed by the Judicial Council of California. The mechanical equipment on this project included a free standing mechanical yard and rooftop units. Athena Engineering, Inc. [...]

SCG HVAC & Building Automation Capital Project – 10 Bases

2017-09-06T20:39:01+00:00

This design-build HVAC and controls project required simultaneous performance on ten bases located throughout Southern California – Santa Barbara, Pacoima, Simi Valley, Hollywood, Pasadena, Chino, Canoga Park, Pico Rivera, Monterey Park and Woodland Hills. Athena Engineering, Inc. served as the design-build General Contractor and self-performed the Mechanical HVAC and controls on this contract. The scope [...]

Blythe Courthouse BAS Integration

2017-09-04T23:14:25+00:00

Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC controls system. The system designed and provided, included: Schneider Electric utilizing SmartStruxure including Lon protocol network and controllers Provided Ethernet IP routing and fiber optics backbone for maximum throughput Provided after hours installation and sequencing in an operational facility.

Riverside Juvenile Court BAS Integration

2017-09-04T23:15:12+00:00

Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC controls system. The system designed and provided, included: Schneider Electric utilizing SmartStruxure including Lon protocol network and controllers Provided Ethernet IP routing and fiber optics backbone for maximum throughput Provided after hours installation and sequencing in an operational facility

Piper Spirit Office Complex

2017-09-04T17:45:22+00:00

The Piper Spirit Office Complex project required Athena Engineering, Inc. to design and build two state of the art office buildings from the ground up. Both buildings are located on a 75,000 square foot lot (1.7 acres), and construction involved the coordination of several dozen trades. Athena Engineering served as the general contractor, mechanical HVAC, [...]

Kaiser Fontana Medical Center Chemical Dependency Recovery Program HVAC

2018-05-10T01:39:37+00:00

This design-build project with Kaiser Permanente included the mechanical, electrical, plumbing, and structural engineering for the removal and replacement of the HVAC at a chemical dependency recovery program (CDRP) in Fontana, CA. The Kaiser CDRP provides inpatient and outpatient substance abuse treatment services, detoxification, partial hospitalization and counseling. Following the engineering portion of the project, [...]

Van Nuys Registrar-Recorder Building Automation Retrofit

2017-11-12T20:12:21+00:00

The Los Angeles County Registrar-Recorder's Office is responsible for the registration of voters, maintenance of voter files, conduct of federal, state, local and special elections and the verification of initiative, referendum and recall petitions for the 4.8 million registered voters in Los Angeles County. The Recorder's Office is responsible for recording legal documents that determine [...]

Augustus Hawkins High School

2017-09-04T15:44:37+00:00

This brand new 62,000 square foot high school for the Los Angeles Unified School District (formerly South Los Angeles High School #3) included a ground up, multi-story high school campus comprised of a gym, classrooms and administration buildings.  Athena Engineering, Inc. was responsible for the entire mechanical scope of work, including the HVAC and [...]

Go to Top