KP Inglewood MOB Chiller Lift 112

Healthcare

Kaiser Inglewood MOB HVAC Upgrade

Design-build air handlers and VAV system — performed in an active MOB.

Client

Kaiser Permanente

Location

Inglewood, CA

Service Line

Design-Build Mechanical General Contracting — Athena Engineering HVAC & Hydronic Piping Mechanical & HVAC — Athena Engineering Prime Contractor Delivery Trade Coordination & Self-Performing Construction

A full mechanical-plant replacement at a live Kaiser medical office — design-build across four disciplines, sequenced so the doors never closed.

Client: Kaiser Permanente
Location: Inglewood, CA
Service Line: Design-Build — Mechanical, Structural, Controls & Electrical

Kaiser Permanente contracted Athena directly to replace the mechanical plant at its Inglewood Medical Office Building — a busy facility running an after-hours clinic, family and internal medicine, pediatrics, a lab, pharmacy, physical therapy, and radiology and diagnostic imaging under one roof.

Athena was awarded the design-build: plans and engineering for all of it, mechanical, structural, controls, and electrical. Then we did the work we’d drawn. We demolished the existing system and installed new air handlers, a chiller, a boiler, piping, and controls.

The catch was that the building never closed. Patients kept coming, imaging kept running, the pharmacy kept filling. So we sequenced the replacement around them, working days, nights, and weekends, swapping a live building’s lungs without interrupting a clinic.

Kaiser keeps handing Athena the work that can’t afford a misstep, like the Ambulatory Surgery Center build-out at its Ontario Medical Center.

Client: Kaiser Permanente. Delivery: Design-Build (mechanical, structural, controls, electrical).

Like this one? Tell us what you're building.

We work across healthcare, civic, education, manufacturing, and the rest of Southern California's working buildings. If your project sounds something like this, we'd like to hear about it.