Opening in 1937, El Sereno Middle School originally operated as a six-year high school, formally known as Woodrow Wilson High School. In 1969, this historic campus took over the name El Sereno Middle School. This public middle school, located in East Los Angeles CA, is home to 1,358 students, ranging from sixth to the eighth [...]
Dodson Middle School Entry Pavers
athenac7112017-09-06T22:32:46+00:00As part of Athena Engineering, Inc.'s Job Order Contract with Los Angeles Unified School District, we were engaged to manage the installation of new entryway pavers for this keystone campus in Rancho Palos Verdes, CA. In the tight one-month compressed schedule during the summer vacation months, Athena Engineering and our team of subcontractors demolished and [...]

Aliso Canyon Gas Storage Facility – Guard Shack
athenac7112017-09-06T00:10:14+00:00This design-assist project was awarded to Athena Engineering, Inc. by the Southern California Gas Company, a division of Sempra Energy. The Aliso Canyon Gas Storage Facility is an oil field and natural gas storage facility in the Santa Susana Mountains in Los Angeles County, California. This gas storage reservoir is the second-largest natural gas storage site in [...]
Macy’s Las Vegas Home Store Parking Lot
athenac7112017-11-12T20:13:03+00:00The Macys Home Store is located in Las Vegas, Nevada is a busy department store sitting on over 203,500 square feet of property. Athena Engineering was contracted for multiple projects on site, including shoring of the overhang and replacement of the asphalt, concrete, and gutters on the entire property. Athena Engineering managed the scope of [...]
O’Melveny Elementary School ADA Upgrade
athenac7112017-10-20T19:44:34+00:00O’Melveny Elementary School, located in San Fernando CA, serves 565 students from kindergarten through fifth grade. Athena Engineering was directly contracted by the Los Angeles Unified School District to manage the removal and replacement of asphalt in several locations, providing all students with ADA compliant paths of travel. In each location we made modifications to [...]

Coldwater Canyon Elementary School ADA Upgrade
athenac7112017-10-20T19:37:26+00:00Athena Engineering had the opportunity to complete many projects as part of job order contract with the Los Angeles School District, including an ADA upgrade at Coldwater Canyon Elementary School. This beautiful campus is located in North Hollywood CA, and serves just south of 800 students ranging from the kindergarten level to the fifth grade. [...]