USPS Industry P&DC Controls & VAV Replacement

2020-03-31T20:04:55+00:00

Athena Engineering was awarded this project as part of a lump sum base bid direct to the United States Postal Service. The City of Industry Processing and Distribution facility is one of the main processing hubs for the USPS in the San Gabriel Valley and Inland Empire. It processes 350,000 packages per day during [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration

2018-02-15T21:09:07+00:00

The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]

Marshall High School Prop 39 Controls Replacement

2020-04-09T19:03:18+00:00

This project was a retrofit of existing HVAC equipment with new sensors, actuators, network cables, and a new DDC system as part of a bond-funded energy retrofit project for this historic LAUSD High School built in 1931. Athena Engineering, Inc. was contracted directly by McKinstry Essention, the LAUSD Energy Manager, and was the primary HVAC and [...]

Beverly Hospital

2018-10-03T18:30:06+00:00

Beverly Hospital is a general medical and surgical hospital in Montebello, CA, with 102 beds. In 2016, over 15,000 patients visited the hospital's emergency room. The hospital had a total of 7,180 admissions. Its physicians performed 1,204 inpatient and 2,952 outpatient surgeries. Athena Engineering, Inc. was engaged by the mechanical engineer, Ted Jacobs Engineering, [...]

Southwest Justice – Juvenile Courts Relocation

2017-09-28T23:30:00+00:00

In 2014, the County of Riverside Economic Development Agency approved the construction of a new 14,400 juvenile hall court building with associated facilities at the Southwest Justice Center in Riverside, CA, managed by the Judicial Council of California. The mechanical equipment on this project included a free standing mechanical yard and rooftop units. Athena Engineering, Inc. [...]

Downtown Disney Metering

2017-09-06T22:14:54+00:00

Downtown Disney (officially the Downtown Disney District) is an outdoor shopping center located at the Disneyland Resort in Anaheim, California. It opened in 2001 as part of an expansion of the resort from one theme park(Disneyland) to a multi-park resort complex. The various tenants throughout the Downtown Disney area require separate tenant metering for individual [...]

Griffith Observatory Rehabilitation & Remodel

2017-09-06T22:15:50+00:00

Griffith Observatory is one of Los Angeles’ most visible and beloved landmarks, hosting over 70 million visitors since opening its doors in 1935. However, after decades of heavy use, the building was badly in need of repairs and upgrades – to both the physical building and the exhibits. The 2002 $93 million renovation project involved [...]

LACCD Los Angeles City College BAS Retrofit

2017-09-04T23:59:53+00:00

Athena Engineering, Inc. won this project with Schneider Electric as an Energy Services Contract (ESCO) design-build. The system designed and provided for the LACCD LA City College included renovation and additions to the entire campus infrastructure. All construction and retrofit was performed while the campus was fully occupied and the facility was operational. Other pieces [...]

Santee High School Proposition 39 HVAC & Controls Retrofit

2018-05-10T01:34:11+00:00

Athena Engineering, Inc. was selected by McKinstry Essention as the HVAC and building automation design-build partner for this retrofit project at the LAUSD Santee Education Complex. This project was funded by California's Proposition 39, a bond measure providing an estimated $2.75 billion over five years — to support energy efficiency and clean energy projects in K-12 schools and [...]