Division 13 Metro Bus Maintenance & Operations Facility

2020-04-09T19:05:01+00:00

The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]

Southwest Justice – Juvenile Courts Relocation

2017-09-28T23:30:00+00:00

In 2014, the County of Riverside Economic Development Agency approved the construction of a new 14,400 juvenile hall court building with associated facilities at the Southwest Justice Center in Riverside, CA, managed by the Judicial Council of California. The mechanical equipment on this project included a free standing mechanical yard and rooftop units. Athena Engineering, Inc. [...]

Aliso Canyon Gas Storage Facility – Guard Shack

2017-09-06T00:10:14+00:00

This design-assist project was awarded to Athena Engineering, Inc. by the Southern California Gas Company, a division of Sempra Energy. The Aliso Canyon Gas Storage Facility is an oil field and natural gas storage facility in the Santa Susana Mountains in Los Angeles County, California. This gas storage reservoir is the second-largest natural gas storage site in [...]

LACCD Southwest College – School of Career & Technical Education

2017-09-04T18:29:26+00:00

The Los Angeles Community College District - Southwest College School of Career and Technical Education (SOCTE) provides practical, hands-on training to diverse, multi-generational user groups in a safe and inviting campus facility. Large expanses of glass and open-air corridors, lobbies, and courtyards exhibit the professional training and instruction taking place on the inside. Athena [...]

Amelia Mayberry Park Senior Center

2018-02-16T00:13:39+00:00

Amelia Mayberry Park is a 14-acre park located in the heart of Whittier, CA. This local treasure has basketball courts, softball fields, playgrounds, a Fitness Zone and a splash pad where children can cool off during the warm days of summer. A newly refurbished Senior Center located within the park is the site of great [...]

Ramon C. Corines School of Visual and Performing Arts

2018-06-30T22:14:27+00:00

This project involved the new construction of a visual and performing arts high school in Los Angeles. The campus is within the Los Angeles Unified School District and consists of nine buildings and a central plant. Athena Engineering, Inc. was responsible for the installation of an Energy Management System consisting of Variable Air Volume [...]

Go to Top