Project Description

San Manuel Indian Casino is a 24/7-operational facility. The client required a functional Heating Ventilation and Air Conditioning system controlled through a Building Automation System (BAS) to ensure the comfort of their customers.

The detailed plan we created outlined the commissioning process, including establishing specific responsibilities and lines of communication. The intent of the plan was to work in conjunction with Division 15, University Mechanical and Infinite Control System.

Athena Engineering, Inc. acted as a third party controls commissioning integrator, going through the necessary checks and balances to verify the installation, function, integration and performance of the installed system. As a third party controls commissioning integrator, our goal was to provide the highest level of functional integrity and assure the reliability of the system.