The Southern California Gas Company's Pico Rivera base is the headquarters for the utility's facilities, training, and various operational departments. Athena Engineering, Inc. was the holder of a 3-year Master Services Agreement with Southern California Gas and managed the replacement of two chiller's at the Pico Rivera base. The design-build chiller replacements involved the [...]
Riverside Hall of Justice BAS/VFD Upgrade
athenac7112018-10-03T18:32:19+00:00Athena Engineering, Inc. won this project on a best value design-build Request for Proposal in conjunction with the Judicial Council of California and Jacobs Engineering. Athena Engineering, Inc. provided a design-build solution for the entire facility’s HVAC building automation system. The system designed and provided, included: Schneider Electric StruxureWare utilizing LonWorks protocol network and [...]

Torrance Airport Atrium Building Energy Upgrades & Controls Integration
athenac7112018-02-15T21:09:07+00:00The Airport Atrium building in Torrance, CA is a multi-story 97,000 square-foot Class A office building. This beautiful building includes a 4-story glass atrium with a feature fountain and large office spaces for tenant use. In 2015, Athena Engineering was contracted by the new owners of the building to perform on-site surveys for existing [...]
Montebello Library Chiller
athenac7112018-02-13T20:04:34+00:00Montebello was the first city in Los Angeles County to build a library with funds raised by a bond issue ($30,000). The building was erected in July 1930 at 115 So. Taylor Avenue. It served the community for 36 years before the library's current building was dedicated on October 20th, 1966. Athena Engineering, Inc. [...]

Division 13 Metro Bus Maintenance & Operations Facility
athenac7112020-04-09T19:05:01+00:00The Bus Maintenance & Operations Facility was designed to optimize Los Angeles County Metro's bus transit service throughout the Central Los Angeles region. The new sustainable facility accommodates a fleet of 200 CNG (compressed natural gas) buses. The project entailed construction of a cast-in-place concrete parking structure housing the Metro [...]
Olive View UCLA Medical Center
athenac7112018-10-03T18:28:43+00:00Los Angeles County Olive View – UCLA Medical Center is a 377-bed county hospital located in the north end of the San Fernando Valley that serves low income and indigent patients, as well as the surrounding community. Athena Engineering, Inc. was hired by Western Allied Mechanical to install the building automation system in the [...]

Santiago Community College Science Building
athenac7112017-10-20T22:00:46+00:00In 2002, voters approved Measure E, a $337 million general obligation bond to renovate existing campus buildings, construct new classrooms to alleviate overcrowding and expand the educational and training programs at Santiago Canyon College, Santa Ana College, the regional education centers and the District Operations Center of the Rancho Santiago Community College District (RSCCD). Santiago Community [...]
LACCD Los Angeles City College BAS Retrofit
athenac7112017-09-04T23:59:53+00:00Athena Engineering, Inc. won this project with Schneider Electric as an Energy Services Contract (ESCO) design-build. The system designed and provided for the LACCD LA City College included renovation and additions to the entire campus infrastructure. All construction and retrofit was performed while the campus was fully occupied and the facility was operational. Other pieces [...]

Santee High School Proposition 39 HVAC & Controls Retrofit
athenac7112018-05-10T01:34:11+00:00Athena Engineering, Inc. was selected by McKinstry Essention as the HVAC and building automation design-build partner for this retrofit project at the LAUSD Santee Education Complex. This project was funded by California's Proposition 39, a bond measure providing an estimated $2.75 billion over five years — to support energy efficiency and clean energy projects in K-12 schools and [...]